What are the anticipated costs for the facility?

Although actual costs for the OPF and MMF will be determined through a procurement process, site-specific, revised costs were presented with business cases for both facilities. The estimated capital cost for the MMF is $15M and between $16M and $35M for the OPF (dependent on technology). Based on current contracted costs for transfer and organics processing, both facilities would result in savings over the long-term.