What are the anticipated costs for the facility?

Although actual costs of the MMF will be determined through the procurement process, it is estimated the capital cost of the MMF will be $4.7 million. This considers $1.15 million in significant funding secured from the Continuous Improvement Fund (CIF). Estimated capital costs to develop the OPF could range from $10 to $35 million or higher, dependent on selected technology. Accurate costs, however, will only be determined through site-specific design and the procurement process.