How will the final location of the facility footprint be determined?

Many factors will determine the final facility location and site plan. The location of buildings within the facility clustered on the 207- acre property will consider constraints such as setbacks from the property line and wetland areas, groundwater and soil conditions, and other findings from the technical studies. Setbacks from property lines and environmental features such as wetlands will comply with all municipal and provincial legislation. In addition, distances from sensitive receptors and buffer distances will be an important consideration.

A conceptual site plan outlining the location of the footprint and on-site features was submitted with the technical studies required for Planning amendments. As the Planning process is furthered and the site plan refined, a final site plan will be submitted to the Township of Springwater for approval.